Invitation to quote for the pathway construction at East End Playing Field, Redruth, TR15 2EJ

Redruth Town Council Published 21 Feb 2023 Contracts Finder

key details

Value£25,000
Statusactive
Category (CPV) 45000000
Deadline31 Mar 2023
Contract start1 May 2023
Contract end31 Jul 2023
Procedureopen
SME suitableYes
OCIDocds-b5fd17-351edb2a-047f-4de4-8e29-a3a421e5e084

description

Construction of the long-awaited Redruth Skatepark in East End Playing Fields completed in October 2021. The pathway is needed to provide safe access to this popular new facility and the existing play area.

Details of the new pathway

Redruth Town Council own East End Playing Fields. Planning permission for both the Skatepark and the new pathway is given in planning permission PA21/06079, granted in July 2021.

The pathway is to provide access from East End gate to both the existing play area gate and the new skatepark.
The required pathway & specification is shown on the attached detailed design document.
The total length of the pathway designed is 112.4Lm x 1.2m wide. However, there are three separate sections of pathway as indicated in the legend of the detailed design document. You are required to quote for these three sections separately to give the client some budget flexibility. The 3 sections are:-
Main path to Skatepark 84Lm x 1.2m
Bottom path to Play Area 8.7Lm x 1.2m
Top path to Play Area 19.7m x 1.2m
Picnic Bench Area 2.5m x 4.6m wide
Filter drain total length of 29.5Lm with minimum width 300mm; depth 450mm
The current site is turf. The required pavement surface is tarmac.
As the new pathway is tarmac and the abutting surface is grass, to maintain the integrity of both surfaces two options for edging are given in the specification. The two options are:-
Precast concrete
Wood.

You are required to quote for these two options separately to give the client some budget flexibility.

As the current site is turf, we would also like you to explain how construction plant will access the site.

What we would like from you

We would like the following from you to consider your quote:-

Fixed price quote with the VAT to be shown separately. The quote should be broken down to show the cost for the following elements:-
Main path to Skatepark 84LM x 1.2m, quoted for both Precast Concrete & wooden edging
Bottom path to Play Area 8.7Lm x 1.2m quoted for both Precast Concrete & wooden edging
Top path to Picnic Area 19.7Lm x 1.2m. quoted for both Precast Concrete & wooden edging
Picnic Bench Area of 2.5m x 4.6m wide
Filter drain total length of 29.5Lm with minimum 300mm width; 450mm depth

We would also welcome:

A method statement which outlines the build and also how construction vehicles and plant will access the site and be managed on site. The site is normally open to the public. If you consider this an issue during the pathway build, then please say when quoting.
How long you would anticipate the pathway construction will take you.
A possible start date for the pathway construction if the contract is awarded by the end of April 2023.
We would like your written quotes for this job by 5 p.m. on Friday 31st March 2023.

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
21 Feb 2023 Tender (tender) · 59b7d0a8-3bec-48a9-88e1-660504c20694-617015

more from Redruth Town Council

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.