Lancaster University - Spine Duct Strategic Improvements project - 4- year Framework
key details
| Value | £1,600,000 |
|---|---|
| Status | complete |
| Category (CPV) | 45000000 |
| Region | North West |
| Deadline | 23 Nov 2022 |
| Contract start | 1 Jan 2023 |
| Contract end | 31 Dec 2026 |
| Procedure | open |
| SME suitable | Yes |
| OCID | ocds-b5fd17-34f7ca7f-2b0f-4a78-908c-453dbd925435 |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| Tilbury Douglas Engineering Limited | £1,573,851 | 8 Feb 2023 | active |
description
Lancaster University is seeking to appoint a Principle Contractor to undertake the Spine Duct Strategic Improvements Project. It is envisaged that this project will span approximately 4 years which includes a 12 months rectification period. The contract will be awarded as a Framework so the University can Call off packages of work. The first package of work will commence mid-February 2023 until April 2023 and there will be a second Call Off commencing July 2023, completing before the end of September 2023. Further phases will then be awarded in Summer 2024 and Summer 2025.
The project will target strategic and technical issues identified within the University Spine Duct, which is address Gas Detection and Heat Detection within the ducts in Phase 1 (February - April 2023). Phase 2 (July 2023-September 2023) will include Ventilation, Fire Stopping, Signage and Electrical Improvement Works to the South Spine Ducts. This includes an element of civils and buildings work at ground level. Phase 3 (July 2024 - September 2024) will include Ventilation, Fire Stopping, Signage and Electrical Improvement Works to the North Spine Ducts. This includes an element of civils and buildings work at ground level. The final phase (Phase 4) (July 2025 - September 2025) will include the installation of new gas pipework, gas isolation valves and bypass, making the existing Energy Centre circa 1965 gas pipework and duct redundant.
The estimated value of the project over the 4 phase Framework is £1.6 million net construction cost, excluding VAT.
Intended tender method: Design & Build - Single Stage - fixed lump sum for the first 2 Call Off packages of works (Phase 1 and Phase 2) on the basis of RIBA Stage 4 design information. Phases 3 and 4 will be lump sum at tender stage, with Open Book cost uplift for any costs increases, over and above the tender sum cost, negotiated and agreed with Cost Consultant and industry standard rates (BCIS) prior to award of each remaining Phase/Call Off package of work.
The location of the site is Bailrigg Campus, Lancaster, LA1 4YW.
This tender is not lotted. One contractor will be awarded to the Framework
The University will host accompanied site visits on Monday 24/10/22 & Tuesday 25/10/22. A maximum of two attendees per tenderer is permitted to attend. Please register your intention to attend via the In-Tend 'correspondence' function by 12 noon Thursday 20th October 2022 at the latest as you will be allocated a time slot and informed via In-tend by Friday afternoon.
University's e-tendering portal: In-Tend
https://in-tendhost.co.uk/lancaster/
DOCUMENTS MUST BE ACCESSED AND SUBMISSIONS MADE VIA THIS PORTAL.
Any clarifications on procedure, documentation or the project generally must be raised through the In-Tend 'correspondence' function.
In-Tend Support:
Phone: 0845 557 8079
E-mail: support@in-tend.com
Web : https://in-tendhost.co.uk/lancaster/aspx/Help
documents
- https://www.contractsfinder.service.gov.uk/Notice/c3b58c21-8cf2-41c0-a614-a5ef35f2ab17 , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 9 Feb 2023 | Award (award) | · | 743febcb-0da4-425b-ad90-d63153288c11-613410 |
more from Lancaster University
- Cryosystem for XRD · £64,750 · 18 Feb 2025
- NIRS Neuroimaging System · £300,000 · 27 Sept 2024
- Purchase of 2 Walk in Growth Rooms to be Integrated with Plant Phenotyping Equipment · £557,000 · 11 Dec 2023
- General Building Works Framework · £2,000,000 · 31 Oct 2023
- Hard Landscaping inc. Civil Engineering Works Framework · £200,000 · 23 Oct 2023
- Lancaster University Flooring Framework · £125,000 · 14 Jul 2023
- LUMS Refurbishment (Phase 2 East) 2023 · £15,800,000 · 16 Jun 2023
- The Ruskin Museum & Research Centre UMA Refurbishment Project · £5,000,000 · 8 Jun 2023
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- PLACE1266H MHA PSP4 Agency Staff - S278 Street Lighting Support Scheme (2026 2027) · Derbyshire County Council · £80,000
- ENQ1310 - 2026-27 Structures Programme Assistance · DERBY CITY COUNCIL · £25,000
- CPU 7199 - Newstead Abbey MEND repair programme Quantity Surveyor · Nottingham City Council · £38,665
- CPU 7275 - Newstead Abbey MEND Repair Programme Conservation Accredited Lead Advisor · Nottingham City Council · £68,996
- Tickford Park Primary School SEND Unit · Milton Keynes Council · £101,188
- Cleeve and Yatton Small Transport Hubs · North Somerset Council · £116,495
- Lowca Community School - Damp remediation works · Cumberland Council · £47,080
- L9-102 ATE Monument Roundabout · North Lincolnshire Council · £198,564
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.