SupplierValueDateStatus
not named £43,000 1 Dec 2020 active

description

The Thames Tideway Tunnel project (the Project) will control CSO discharges by intercepting and diverting combined sewage flows into a new storage and transfer tunnel. The main tunnel will run from Acton Storm Tanks in west London to Abbey Mills Pumping Station in the east, where it will connect to the Lee Tunnel, which will transfer the combined sewage to Beckton Sewage Treatment Works for treatment. The Project extends from Acton Storm Tanks in west London, to Abbey Mills Pumping Station in east London. The Project includes associated works at Beckton STW, Shad Thames Pumping Station and Bekesbourne Street.

The geographic layout of the Project and local authorities through which it passes is shown in Figure 1.

The Project comprises:

  • a.tunnels:
  • i.a main tunnel which will capture and store combined sewage from CSOs along its route and transfer it to Abbey Mills Pumping Station, from where the Lee Tunnel will transfer it for treatment at Beckton Sewage Treatment Works
  • ii.11 connection tunnels, which will link flows from CSOs to the main tunnel.
  • b.Worksites:
  • i.five main tunnel Worksites (drive and/or reception sites)
  • ii.16 CSO Worksites
  • iii.two System modification Worksites Thames Tideway Tunnel
  • iv.works at Beckton Sewage Treatment works.

Section 4: Scope of Works

Part 1)

Scope of Supply Attenuation Tank:-

BMB JV require fabrication and supply of permanent formwork for an Attenuation Tank at Hammersmith site. Panels shall be made to the geometry displayed in the drawings provided for the Attenuation Tank. All panels are to be laminated as the soffit will be submerged by BMB JV systematically.

Panels shall be delivered to site labelled in-order to allow BMB JV to install the panels in the correct sequence.

Supply of all ancillary items such as grout check and joint sealing tapes should be detailed and included in the supply.

All supporting documentation for a material compliance report should be provided prior to order delivery.

No openings are required as BMB JV will post cut on site.

Attenuation Tank Building Drawings 3320-AAJVX-HAMPS-540-SZ-DR-000040

3320-AAJVX-HAMPS-540-SZ-DR-000041

Part 2)

Hammersmith Shaft Scope of Supply: -

BMB JV require fabrication and supply of permanent formwork for a drop shaft at Hammersmith site. The supplier is to conduct a design check on the panels proposed for permanent and temporary loadings and spans for the Hammersmith Shaft.

Supply of all ancillary items such as grout check and joint sealing tapes should be detailed and included in the supply.

Panels shall be delivered to site labelled in-order to allow BMB JV to install the panels in the correct sequence.

Supplier will produce manufacturing drawings for panel layout for BMB's approval. All documentation to be supplied for panel layout to be checked by BMB temporary works department before commencement

Additional information: BMB-JV Tideway West, Hammersmith Pumping Station, Distillery Road, Hammersmith, W6 9AD

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
12 Mar 2021 Award (award) · 45069d1f-46f3-4df9-834e-56e40917a134-418177

more from BMB Joint Venture (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty)

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.