CMF 042 Stonebridge - Wretham Peddars Way
key details
| Value | £65,000 |
|---|---|
| Status | complete |
| Category (CPV) | 45233253 |
| Deadline | 29 Oct 2021 |
| Contract start | 16 Dec 2021 |
| Contract end | 3 Mar 2022 |
| Procedure | limited |
| SME suitable | Yes |
| OCID | ocds-b5fd17-32916ca9-11c5-42e7-ab7b-fee5394786a6 |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| MACKHOUSE LANDFILL SOLUTIONS LTD | £65,000 | 16 Dec 2021 | active |
description
Request for quotes sent to three suppliers on 30 September.
Deadline for submission of quotes 30 October 2021.
Reason for works:
This section of the Peddars way has fallen into disrepair following extensive flooding during the winter of 2020/2021
Following this flooding the path has suffered from increasing amounts of damage due to very soft surface.
Description of works:
Surface scrape up to 100mm to 3 metre width x 600 metres length to create level surface
Surface to be laid as highlighted in attached drawings (Type 1 sub-base with granite fines mechanically tamped down)
Parcel of land to the area between gate and access on to the Wretham circular footpath (Approx. 7 m x 3m) to be cleared to a depth of 1 to 1.5m. A Drain / Aqua Cell / Soakaway to be installed within the area excavated.
Also running on the right hand side (bridge side) a Culvert needs to be installed to take away any surface runoff caused by the slope of the path into the soakaway. This needs to be approx. 9m long and 1.5 metres deep and filled with pea shingle to allow water to soak into the drain.
New surface laid throughout the 600 metres with a cross camber to allow any surface water to drain into the French drain and aqua cell area
| Assumed items: | • | Four 1000mm x 500mm x 400mm Aquacell CORE-R units. |
| • | 9m X 1.5M X 1M Stone filled soakaway | |
| • | 3 metre x 600 metre surface scrape | |
| • | Installation of new improved surface (Type 1 sub-base with granite fines mechanically tamped down) |
Delivered Outputs/Outcomes 1. 600m (x 3 metres) Improved surface for all users of the Peddars way
- Improved drainage on the route
- Vegetation clearance and crest lifting to allow more light and air into area
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 17 Aug 2023 | Award (award) | · | 79664159-8383-4f64-af50-7cd1c5521ba3-673046 |
more from Norfolk County Council
- Route Optimisation Software · £70,300 · 17 Jun 2026
- Real Time Passenger Information (RTPI) Data Management Information · £409,500 · 17 Jun 2026
- ESRI Licenses · £472,000 · 24 Apr 2026
- Condition Report Refurbishment Works Phase 3 · £155,306 · 5 Feb 2026
- Wherryman's Way Erosion Mitigation and Repair Works · £161,689 · 29 Jan 2026
- Fire Ground Radios · £500,000 · 23 Jan 2026
- Body Worn Video Camera Technology · £198,258 · 6 Oct 2025
- Provision of Bus Lane and Moving Traffic Offences Managed Service · £717,500 · 1 Oct 2025
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- WLNR Footpath Resurfacing · Hedge End Town Council · £42,500
- Spen Bottom Access Improvements · Kirklees Council · £128,279
- ENQ1270 - Chellaston park footpath · DERBY CITY COUNCIL · £25,615
- Footpath Upgrade in WLNR · Hedge End Town Council · £42,500
- Resurfacing of Wander Paths · The State Hospitals Board for Scotland
- Path repair and access improvement work on the Coast to Coast in the high fells of the Lake District · Lake District National Park Authority · £63,000
- CA16582 - RFQ 2025/31 Renovating the Walled Garden Pathways at Castlewellan Forest Park · Newry, Mourne and Down District Council (NMD)
- GB-Braintree: EPP0210 - Witham Footpaths Improvements · Braintree District Council · £68,064
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.