Temple Quay, Plot 3 Infrastructure Works
key details
| Value | £1,300,000 |
|---|---|
| Status | complete |
| Category (CPV) | 45200000 +1 more |
| Region | South West |
| Deadline | 22 Feb 2016 |
| Contract start | 1 Mar 2016 |
| Contract end | 31 Jul 2016 |
| SME suitable | Yes |
| OCID | ocds-b5fd17-31e35260-adc9-11e6-9901-0019b9f3037b |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| Dyer and Butler | £1,158,644 | 17 Mar 2016 | active |
description
The Plot 3 Infrastructure works around Temple Quay being approximately 3,000m2 of pavement construction, generally comprise of stone capping with tarmac sub-base, sand and block paving, and associated works will include the following components:
| • | Earthworks |
| • | Extension of Friary to Meads Reach Bridge |
| o | This work would comprise the extension of Friary as a two carriageway road east of Isambard Walk to Meads Reach Bridge. |
| o | As part of this work the footway to the north of Friary (adjacent to the Plot 3 development site) would be extended to 6 metres in width, as will the footway to the south (adjacent to the station) would be made 8.5 metres in width and include the provision of 6 new benches and an avenue of 5 new trees. |
| o | The Friary will terminate with the provision of a new flexible use open space |
| • | Flexible Open Space |
| o | Space for temporary use will also be provided between the extended Friary and the listed retaining wall (outside of development area) |
| o | The area will be finished with seating terraces, and a planted bank to tie into the existing levels forming an earth retaining structure. |
| o | This area will also need to be made capable of accommodating the occasional vehicle turning. |
| • | Opening Isambard Walk as a two-way vehicular street between Friary and Temple Back East |
| o | The existing pedestrianised Isambard Walk will be opened for two-way vehicle access to create a link between Temple Back East and Friary, and to tie in with the existing road of the private estate. As part of this work a new footway will also be provided to the eastern side of the Isambard Walk new carriageway. |
| o | Isambard Walk will act as a shared space, and so will be treated to reduce the potential dominance of vehicles and reduce vehicle speeds |
| o | The footway, trees, cycle parking and street furniture to the west of Isambard Walk and in The Square would remain as existing. |
| • | Temple Back East |
| o | The existing turning head area on Temple Back East would be removed, to allow two way vehicular access to Isambard Walk |
| o | Two way vehicular access will be maintained to Rope Walk, with a left turn out of Rope Walk into Isambard Walk to be provided for |
| o | Existing crossing will be maintained across from The Square to the footway on Temple Back East |
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 18 Nov 2016 | Award (award) | · | caa314b4-af26-4c65-9cca-92ed59a10ca9-84589 |
more from HOMES & COMMUNITIES AGENCY
- HCA - Asbestos Removal and Demolition Works at the former IMEX Centre, Burton-Upon-Trent · £500,000 · 30 Nov 2017
- .NET developer for TMS System Development · £15,520 · 2 Jun 2017
- .NET Developer for TMS System Development (Service Layer) · £16,000 · 2 Jun 2017
- Scrum Master / Development Manager for IMS · £11,500 · 2 Jun 2017
- Systems Analyst (TMS) · £28,050 · 2 Jun 2017
- PMO 2017 · £25,245 · 2 Jun 2017
- Information Security Officer · £22,950 · 2 Jun 2017
- Scrum Master for Gateshead Projects 2 · £22,345 · 2 Jun 2017
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- Highways Structures Programme · Cheshire west and Chester Borough Council · £21,000,000
- CA16553 - 29/2024 ITT NMDDC Civil Engineering Minor Works Framework, 2025-2029 · Newry, Mourne and Down District Council (NMD)
- Lido Park, Droitwich - Footpath widening & construction. · Wychavon District Council · £59,224
- Active Travel 2026 - Phase 1 · Blackburn with Darwen Borough Council · £344,454
- External Pre-patching & Cleaning Works · Rotherham Metropolitan Borough Council
- REFURBISHMENT OF 2 OPERATING THEATRES AND CONSTRUCTION OF A PLANT ROOM ON THE ROOF OF HULL ROYAL INFIRMARY · HULL UNIVERSITY TEACHING HOSPITALS NHS TRUST · £4,122,344
- SUBSIDENCE REMEDIATION TO 21-23 SMELTERWOOD DRIVE · Sheffield City Council · £70,000
- Bridgwater Tidal Barrier - Construction Continuation Contract · Environment Agency · £125,000,000
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.