HS2 Euston Station - Site Wide Temporary Utiliies and MEP Package

Mace Dragados Published 15 Dec 2020 Contracts Finder

key details

Value£2,500,000
Statuscomplete
Category (CPV) 31681000 +4 more
Deadline5 Jan 2021
Contract start30 Apr 2021
Contract end2 Jan 2024
SME suitableNo
OCIDocds-b5fd17-04b8b712-8435-403a-93a4-62fbedc5a26d

Award

SupplierValueDateStatus
Wingate Electrical Plc £0 21 Sept 2021 active

description

Mace Dragados are seeking expressions of interest from Subcontractors to undertake the Site Wide Temporary Utilities and MEP Package.

The scope of the package consists of but is not limited to the following services/works:

-Provide utility tie-ins to existing services
-Installation and Maintenance of site and hoarding lighting
-Installation, maintenance and subsequent removal of all temporary utilities including plumbing, electrical services etc
-Undertake relocation of electrical services on an adhoc basis
-Installation, maintenance and relocation of small power and accessories as required
-Connections of electrical services up to all site accommodation
-Ensuring safe systems of work are adhered to in all instances
-Management of Electrical assets such as distribution boards, site transformers, lighting, heating and fire alarms etc
-All aspects of generator connections and earthing for provision of temporary power
-Undertake PAT Testing as required

Works shall be contracted under NEC3 Engineering Construction Subcontract terms and conditions (with project specific amendments)

Suppliers must have extensive demonstrable experience of delivering similar complex packages on previous projects of a similar scale on large major infrastructure projects. This experience must be applicable and relevant to the respective lots listed.

If successful selected suppliers will be required to go through Mace Dragados pre-qualification process to be included on the final tender list.

Mace Dragados have been appointed as the Construction Partner to build a fully-integrated HS2 station at London Euston, together with links to the existing London Underground station.

HS2 Phase One includes construction of a new railway line run from London Euston to new stations at Old Oak Common in West London, an Interchange Station near Birmingham Airport and the National Exhibition Centre (NEC) and a terminus station in Birmingham City Centre (Curzon Street).

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
5 Oct 2021 Award (award) · 67f079fe-960d-4574-ae15-b1f26082ae0c-473972

more from Mace Dragados

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.