gvtcx

Replacement of cladding at Adair Tower and Hazelwood Tower - Design

capitalEsourcing Published 14 Mar 2019 Contracts Finder

key details

Value£150,000
Statusactive
Category (CPV) 44212381 +6 more
RegionLondon
Deadline22 Mar 2019
Contract start15 Apr 2019
Contract end31 Oct 2019
Procedureopen
SME suitableYes
OCIDocds-b5fd17-3018d351-b33c-4312-8221-a3ef39d4813f

description

The Royal Borough of Kensington and Chelsea is currently removing external cladding from Adair Tower and Hazelwood Tower, two 14 storey tower blocks located in the north of the Borough.

It is intended to replace the cladding on both buildings with an A1 certified fire rated cladding system while at the same time replacing aluminium windows and balcony doors.

The Council is looking to engage an architect that has the direct experience and immediate capacity to undertake the design of the cladding, windows and balcony doors to both towers through to and including RIBA Stage 4.

A structural surveyor has been separately engaged to consider the load that replacement cladding may put on the buildings. Having the direct experience of designing a cladding system that is A1 certified fire rated is an imperative.

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
14 Mar 2019 Tender (tender) · 56b6f66a-73e5-4a28-9937-1602fd7b2519-276002

more from capitalEsourcing

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.