Saints Trail Reen Rose Bridge Cornwall - Design, Fabrication & Installation of Bridge
key details
| Value | £300,000 |
|---|---|
| Status | complete |
| Category (CPV) | 44212120 +1 more |
| Deadline | 19 Oct 2021 |
| Contract start | 25 Oct 2021 |
| Contract end | 1 Feb 2022 |
| Procedure | open |
| SME suitable | Yes |
| OCID | ocds-b5fd17-2ff5c7f7-ec81-4232-9080-3bd425d1b76b |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| Taziker Industrial Ltd | £125,410 | 13 Dec 2021 | active |
description
Cormac Solutions Ltd are contracted to Cornwall Council for the above-named works and invite you to tender for the sub-contract works package. Should you decide to tender all correspondence, communication and bid submission must be made through the ProContract Portal.
Should your bid be successful you will be required to enter into a subcontract agreement based on an NEC3 Option A subcontract, the subcontract will incorporate the documentation contained in this
enquiry, your bid information and any subsequent clarifications or agreed amendments prior to entering into subcontract.
The Subcontract terms have been amended under Clause Z8 to provide
for a two stage design and construction progress, consisting of :
Stage 1 - Design and submission of design, securing approval from The Technical Approval Authority (Cornwall Council), provision of bridge deck loadings and other design information to enable others to design and construct foundations.
Stage 2 - Manufacture and Fabrication at subcontractor's facility, transport to site and installation.
Compliant bid structure.
All bids must contain a response to both the Commercial (Activity Schedule, Contract Data Part 2) and Quality (Quality Questions) elements. Documents for returning are located in Appendix F detailed later in this document. Tenderers can use the Typical Activity Schedule supplied or develop their own. Tenderers must submit a Fixed Price for the Stage 1 works, and provide a detailed Stage 2 Cost Estimate. Following the completion of Stage 1 by the successful tenderer, the Cost Estimate for Stage 2 will be confirmed taking into account any additional constraints, requirements or enhanced specification requirements imposed by the Stage 1 process, but also taking into account any savings or value engineering that has been identified during Stage 1.
Tenderers must also submit a Clause 31 programme.
Bid assessment.
Bids will be assessed and scored on pre-determined criteria as follows :
Commercial 70% Quality 30% Commercial bids are assessed on two elements :
Activity Schedule worth 65%, calculated as (lowest tender total) divided by (subcontractors total) multiplied by 65.
Contract Data worth 5%, based on the performance of each tenderers rates for Fee , Design and Manufacture against a Change model.
Quality bids worth 30% are assessed using a series of questions set out in Appendix E of the documentation.
. A total of 100 marks is available. Bids are assessed as (subcontractors marks) divided by (100 marks) multiplied by 30.
Enquiry Information.
The information is set out to enable an NEC3 Option A subcontract. The following information is included :
This Invitation to Tender
DRAFT ECC SC Data Parts 1&2 Reen Rose for Enquiry.
Appendix A - Subcontract Works Information, containing a summary document "Saints Trails Reen Rose SC Works Information".
Appendix B - Site Information, containing a summary document "Saints Trails Reen Rose
documents
- https://www.contractsfinder.service.gov.uk/Notice/3c23361c-f69f-4390-a412-bfc9c442c235 , tenderNotice
- https://www.contractsfinder.service.gov.uk/Notice/6dafabf4-97c7-455c-9365-e6ff4fb9b6b5 , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 5 Jan 2022 | Award (award) | · | 92d73e6d-f22b-47f7-9709-6ad93ebf676b-497946 |
more from Corserv Limited
- Poundstretcher Refurbishment, Penzance, Design, Supply and Install Lift and Platform Lift · £100,000 · 7 Nov 2024
- Poundstretcher Refurbishment, Penzance, Structural Steelworks · £50,000 · 6 Nov 2024
- Langarth Village Phase 1 Supply & Installation of Steel & Timber Handrails · £50,000 · 4 Oct 2024
- Langarth Garden Village - Allotment Building · £150,000 · 3 Oct 2024
- 1-8 Riverside View Saltmill Saltash - Demolition · £150,000 · 18 Sept 2024
- 10 Pendower Road Veryan- Major Void Works · £185,000 · 5 Sept 2024
- 1 Langreek Bungalows Polperro - Blockwork Boundary Wall · £100,000 · 22 Aug 2024
- Trevithick Manor Farm S278 - Block Paving Works · £100,000 · 15 Aug 2024
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- Structural Investigation services relating to various underground structures, Kingston Upon Hull, Direct Award Lot 1a · EU SUPPLY LIMITED
- Small Bridge Repairs · St.Helens Council · £135,949
- Design of repairs to the transverse beam adjacent to Column 20B · Middlesbrough Council · £101,732
- Tamar Crossings - Fabrication, Structural Repairs & Maintenance Support Contract · Cornwall Council · £2,999,999
- South Kilvington Bridleway Bridge Supply · North Yorkshire Council · £35,290
- Newport Bridge Bearing Main Works Direct Award from Scape Civil Engineering Infrastructure Framework. · Middlesbrough Council · £691,995
- T1013 - Rab Butler Bridge Repair Works · UNIVERSITY OF ESSEX · £100,000
- Chesterfield Canal Trust - NEC4 Supervisor · Chesterfield Canal Trust Ltd · £12,500
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.