Bridge Deck Waterproofing & Expansion Joints
key details
| Value | £369,831 |
|---|---|
| Status | active |
| Category (CPV) | 45221100 +1 more |
| Deadline | 9 Sept 2021 |
| Contract start | 10 Jan 2022 |
| Contract end | 31 Dec 2022 |
| Procedure | limited |
| SME suitable | Yes |
| OCID | ocds-b5fd17-2f2fedb0-bedd-46ff-9632-4b0f3c724605 |
description
On behalf of the M3 Smart Motorway Alliance working with Highways England we (Balfour Beatty Civil Engineering Ltd) require Waterproofing works to be carried out on a total of 12 bridges and the installation of Expansion Joints on 9 bridges between Junctions 9 and 14 of the M3 project. Providers will be required to have the capacity to deliver works in the Southern Region, Winchester to Southampton. Terms and Conditions speciï¬c to the works will be issued during the tender period for agreement in principle. To register your interest in these works your organisation must hold as a minimum: Constructionline Gold. Tenders will then be issued with a two week return period. Scoring will be carried out within 1 week of return date.
The Subcontract Scope for Waterproofing works will be people, Equipment, Plant and Materials to (where appropriate)
| - | Waterproofing to be applied in accordance with SHW Appendix 20/1. Spray applied waterproofing to be applied and lap as a minimum 150mm onto existing water proofing. |
| - | There are 12No. underbridges which will require water proofing. There is approx. 125m2 of spray applied water proofing per bridge. |
The Subcontract Scope may also include the sealing of gaps with 1200-gauge polythene sheeting.
The Subcontract Scope for Bridge Joints works will be people, Equipment, Plant and Materials to (where appropriate)
| - | Bridge deck joints to be installed as per SHW 2300 appendix 23/1. Bridge deck expansion joints shall satisfy the requirements of CD 357 'Bridge Expansion Joints'. |
| - | There are 9No. bridges requiring new transverse joints totalling 20No. joints. There is 1No. longitudinal joint replacement. |
- Please confirm that you hold a Constructionline Gold account or Common Assessment Standard, of "Verified" status. Please provide a valid account number.
- What are the most significant H&S challenges that you foresee on the Smart Motorways Alliance Projects and can you demonstrate how you as a company will mitigate against these challenges?
- Provide details of your current and future secured workload (Dates, values, resource requirements) and confirm that you will have sufficient resource available to deliver to the scheme's requirements.
- Please confirm if you have SMART Motorway Experience and detail which previous projects you have worked on if applicable.
- Please provide ISO9001, ISO14001 and ISO45001 Certificates.
documents
- https://www.contractsfinder.service.gov.uk/Notice/b717643e-1ae4-4335-a003-9ea9d7f015e9 , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
more from BALFOUR BEATTY CIVIL ENGINEERING LIMITED
- A66 - Access and Haul roads · £100,000 · 22 Jul 2026
- A66 - Works Examiner · £500,000 · 22 Jul 2026
- A66 - Security package · 2 Jun 2026
- Balfour Beatty - Roads North of the Thames-LTC - Sheet Pile Walls · £1,500,000 · 21 May 2026
- Balfour Beatty - Roads North of the Thames-LTC - Reinforced Soil Walls · £2,500,000 · 13 May 2026
- Balfour Beatty - Roads North of the Thames-LTC - Pavement Survey Works · £50,000 · 13 Mar 2026
- Balfour Beatty - Roads North of the Thames-LTC - Demolition Works · £100,000 · 23 Feb 2026
- A66 - FRC · £5,000 · 20 Feb 2026
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- Queens Bridge A93-03 Remedial Works · Perth & Kinross Council · £71,663
- Liss Bridge Works · East Hampshire District Council · £40,070
- Barrier Safety Improvement Scheme · Humber Bridge Board · £5,000,000
- Centurion Way combined footway and cycleway works: Cucumber Farm to Littlewood Bridge · South Downs National Park Authority
- HNL - AOMR - Charville Lane access bridge replacement · Environment Agency · £168,006
- Moorside & Wardley Railway Bridge Refurbishment Scheme · Salford City Council · £134,420
- HNL - AOMR - Cottage Weir North Footbridge · Environment Agency · £82,973
- Milner Lane Culvert Rebuild (L1255) 2025 · Leeds City Council · £21,300
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.