Procurement of Mezzanine floor and clean room
key details
| Value | £100,000 |
|---|---|
| Status | complete |
| Category (CPV) | 45213200 |
| Deadline | 20 Aug 2021 |
| Contract start | 2 Sept 2021 |
| Contract end | 30 Nov 2021 |
| Procedure | open |
| SME suitable | Yes |
| OCID | ocds-b5fd17-2cc9576f-2d6f-4c29-9230-d625ea9dc7f2 |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| DC SPACE & STORAGE SOLUTIONS LTD | £93,600 | 20 Aug 2021 | active |
description
The Oxford Health Company, setup in 2012, is located in Bicester Oxfordshire, in the heart of the UK and is the owner of the brands Oxford Vitality and Oxford Contract Manufacturing.
Our manufacturing facilities are certified FSSC 22000 and a major business objective is to ensure that all operations concerning the sale & manufacture of its products conform to the standards so the certification can be maintained.
We operate in a new facility opened in 2019 which totals 14,000 sq ft and due to expansion we want to add a mezzanine floor to increase the number of production rooms we have on site.
Brief
We require the design and build of a new mezzanine floor to increase production space in our existing facility.
In addition we need a clean room constructed to enclose the space.
We have produced a full specification that should have all the information required to provide a quote.
Specification
Attached is the detailed specification with all relevant information relating to this tender including how to apply and how the process will be judged.
Mezzanine
The mezzanine is to be installed over existing internal rooms, these are constructed with timber stud walling, therefore we will require the mezzanine to be installed with fire protection underneath to meet minimum statutory requirements. There will be no need for lighting etc under the mezzanine and simple fire boarding or a similar low cost option is satisfactory.
The mezzanine will need to have a large room constructed on it to enclose the floor space.
Hygienic doors with viewing windows into both staircases will enter into one large area.
Potential places for support pillars have been planned out in the simple diagram on the specification document to indicate the best places when considering the rooms underneath, this can be changed but should be followed closely and changes agreed. Viewing of the site can be arranged.
The mezzanine room will be used as a mixing / blending area and will need to contain a tumbler, weight around 2.5 tonnes which will pickup and blend 1 tonne IBC (3,500 Kg in total with some inertia force from a 12 RPM spin of the 1000Kg Mix Drum), at any one time there would not be more than 15 Tonnes of Equipment and Materials, however to overspec we have decided on a total weight capacity of 25 Tonnes being suitable.
The mixed IBC will be rolled by hand on wheels above the "Drop Through" holes, these are 50cm diameter holes we require made in the hole in the locations on the simple plan attached.
Our selection criteria will be based upon:
75% price
10% Quality of specification 10% Time
5% Quality of response
Applying & Questions
To apply or submit questions please contact Pete@tohc.co.uk
Additional information: Site visits are welcome but please note that due to COVID measures we will require any visitor to carry out a questionnaire and wear PPE on site.
Please contact us before the 6th August if you would like to arrange a sitre visit.
documents
- https://www.contractsfinder.service.gov.uk/Notice/85bd5ceb-9cc0-40df-8947-885e5084a9fc , tenderNotice
- https://www.contractsfinder.service.gov.uk/Notice/Attachment/ab26aa16-5adf-4a6c-810f-4917b0a42345 , technicalSpecifications
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 3 Sept 2021 | Award (award) | · | 822c0f5b-a2be-4b8e-9acf-660a664d7103-465830 |
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- Ravenscraig Enterprise Park - Phase 1 · Fusion Assets Ltd · £3,785,212
- Grandidges Quay New Build Warehouse · The Mersey Docks and Harbour Company Limited · £12,000,000
- Adswood Depot Redevelopment · Stockport Metropolitan Borough Council · £6,960,000
- Peffer Place Business Park · The City of Edinburgh Council · £8,000,000
- Coulport Building 220 Work Package CAN · Ministry of Defence
- Building 210 Work Package CAN · Ministry of Defence
- Vernon Park, Wolverhampton. WV10 7HP · Staffordshire County Council · £12,000,000
- Boundary Treatment Paterson Street Mill · Blackburn with Darwen Borough Council · £30,000
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.